Final Touches for the Staging Level

Final fascia pockets
The final 3 fascia pockets are in place in preparation for benchwork being laid on top of them

I spent a few hours on the layout this past week primarily getting the staging level ready to have benchwork for the main level laid on top of it. There will only be 8″ or so between the decks, so it will be tough to do things like swing a hammer to nail down track once the main level goes in. I pounded the 100s of track nails down well to avoid trouble later, and I finished the final 3 fascia pockets for holding clipboards and other operator paperwork. As you can see, I tried to pick places where nothing is going on behind the pockets so I’m not covering switches or key viewpoints for spotting trains or clearing fouling points and the ends of tracks. Not sure exactly what I’ll keep in the lower pockets, though the one in the back corner is big enough to hold 8.5×11″ papers, so I finished it out with a masonite floor. I will say, I grossly underestimated the amount of sawdust MDF makes!

Extra storage tracks
Using some extra space on the staging level for car storage tracks

While I was at it, I decided to fill up some of the extra space on the staging level with a few car storage tracks. Who doesn’t need more places to store cars, right? I’ve got plenty of staging, but being a coal railroad with little non-coal traffic, I wanted a place to store some of the extra non-coal cars that won’t be used every session, and I wanted to store them where I could easily add them to trains without taking up an actual staging track. I just nailed in 3 tracks directly onto the subroadbed in a spot that’s easily accessible and doesn’t block anything critical behind it like switches or fouling points for the active staging tracks. It’ll hold about 15-18 cars which will help. I’ve already got a coupe extra short staging tracks for the locomotives. These are connected to the railroad via a switch because I didn’t want to be picking up locomotives every time I swapped them out–I’m ok with the extra handling of freight cars.

While I’m giving an update, here’s a picture of the toughest benchwork on the layout so far–it’s the corner by the door that goes around the staging helix. What made it so tough is I wanted to match the curvature and location of the staging-level fascia below, and it happens to be a series of complex curves with NONE of the edge on a 90 or 45-degree line. I also wanted it to be secured well enough to walls, cantilevers and the helix that it wouldn’t need legs down to the staging level. I ended up building it in-place around the helix, and I’m satisfied it will do the trick.

Helix corner benchwork
Some of the toughest benchwork on the layout to match the curvature of the staging fascia and work around the helix

3 replies on “Final Touches for the Staging Level”

  1. Dan
    Thanks for the update. Great to see the progress. One question, are you using flex track for the entire layout or just in staging? Will you hand lay the turnouts again?
    Bill Michael

  2. Bill, all the hidden trackage will be flex track: staging, helixes, hidden runs. All the visible track will be hand-laid as well as all the switches (including staging).

Leave a Reply

Your email address will not be published. Required fields are marked *