Four Years of Progress

Yesterday marked the fourth anniversary of the first piece of benchwork for the St. Charles Branch. I’m certainly not moving at any blistering pace, but it’s fun to look back and see the progress! Here’s a look at how one corner of the layout has progressed over those years. Mayflower is at the end of the Bailey’s Creek Branch and is the largest loader on the lower deck. I really like how the scene is shaping up!

Here’s the first piece of benchwork installed for the staging area under Mayflower on October 26th, 2019.

The first piece of bechwork

The next year was lockdown year, so by October 2020 the staging level was complete and the DCC system was up-and-running. I finished the last piece of the lower-level benchwork with this final piece that would ultimately support the scene at Mayflower.

Finished Lower Level Benchwork

By the middle of 2021, I was making good progress on the handlaid track. The track at Mayflower was the first to be completed, and by October of 2023, I had run up the helix from staging and was on my way to connecting the line from St Charles to Mayflower by the end of the year.

Rough Fascia in Mayflower

2022 was a productive year, and by October, I had finished the fascia, installed the backdrops, and was working on the scenery base. Mayflower was the first area to get its “paper shell” covering.

Paper shell scenery step 3

Here’s the scene at Mayflower today in 2023. Vegetation is still sparse, but in the past year, I’ve learned how to paint backdrops, finish the scenery base, and ballast track. I’ve also added some fun features like working crossing signals for major grade crossings and fusees for smaller grade crossings like this one at Potts Branch Road. It’s getting there!

Run-Around move at Mayflower

For comparison, here’s a view of the prototype scene at Mayflower as it awaited the scrapper’s torch (photographer unknown).

Mayflower Tipple

Hope you’ve enjoyed the trip down memory lane!

More Coal Loader Mock-Ups

Coal loader mock-ups in St Charles
Here’s the full mocked-up scene with the St Charles Switcher preparing to swap empties for loads at the JAD Turner loader–the St Charles loader can be seen just around the hillside

As I’ve discussed previously, I like to build mock-ups out of foam core and paper of the larger structures on the layout that I will eventually scratchbuild. This serves three purposes. First, it gives me an opportunity to create a line-drawing / blueprint and make sure the drawing works before cutting more expensive materials. Second, it allows me to visualize a scene and make adjustments before I build the permanent structure. And third, it gives me a good stand-in on the layout until I can build the real one–something that makes operations a lot more fun than imagining there’s a big structure where you’re switching! For this third reason, I put a little extra effort into the drawings to give them some color and texture. I’ve covered the techniques before, so I won’t repeat them here.

This project involved the two “truck dump” tipples that were built in the late ’70s (as far as I can tell) near St Charles, VA. One is known as JAD Turner, and it’s probably still standing today. The other sat on the wye at St Charles for just a few years–I don’t know it’s name, so I’m just calling it the St Charles loader (super original, I know…). What made this project challenging is I didn’t have any good photos of the loader configuration I needed to model. JAD Turner was modified over the years with a second conveyor and second empty track, but the earliest photo I have of it (a grainy aerial from 1981) clearly shows only a single conveyor. I’m modeling it as if it’s the same tipple but with fewer added parts, so I took the dump shed / crusher section of the current loader along with a single conveyor and came up with this design that looks reasonably close to the aerial.

JAD Turner Tipple
Here’s the JAD Turner loader near St Charles in the late ’90s with additional chutes added, but I modeled the core dump shed, crusher, and one of the conveyors (Robby Vaughn photo)
JAD Turner loader mock-up
Here’s the finished JAD Turner loader mock-up complete with a little double chute over the rails

St Charles was a little more challenging as the ONLY photo I have is a grainy aerial from 1981 showing what looks like a pile of coal, a conveyor (maybe two), and what looks like a dump ramp but no shed. I didn’t have to look far to find something close. Just up the road between St Charles and Mayflower was a loader known as “Southwest” which had a similar dump and conveyor arrangement. Southwest was built after my era, so I won’t have to have two similar looking loaders on the layout. Who knows, perhaps they moved the loader from St Charles up to Southwest? That’s my story until someone proves otherwise…

Southwest Loader near St Charles
The Southwest loader sat between St Charles and Mayflower but after my era–I’m using it as the prototype for my St Charles loader (Robby Vaughn photo)
St Charles loader mock-up
A view of the St Charles loader mock-up showing the ramp and dump area

Anyway, here are the results, and I’m really liking the scene now. I can’t wait to build the real things! But first the upper deck…

Ballasting Track on the St. Charles Branch

Ballasted St Charles
Here’s the St Charles wye with ballast. Note the area of cinders where a track used to be

While I finished the basic scenery forms on the lower deck a few weeks ago, I decided it would be better to ballast the tracks before adding the upper deck benchwork while I still had good access to them. I’m so glad I did because ballasting gives the scenes a much more “finished” look even though there’s still a ton of scenery work to be done. I’ll be honest, I was dreading ballasting the track–I had little experience with ballast, but from that experience I saw it as a frustrating, tedious, and time-consuming job. I have now changed my tune! While it’s still time-consuming, I was able to learn and mature my techniques quickly to avoid the frustration and tedium, so I’ll pass along my method here.

First, I had to determine what kind of ballast I needed. This wasn’t as straightforward as I’d hoped. As best I can tell, most of the tracks in my area were at one time ballasted in cinders harvested from steam locomotives. The steam locos went away in the 1950s, and with them the ability to get cheap and ready cinders for ballast. Photos from the ’80s and ’90s clearly indicate most everything got covered in rock ballast–would the cinders still be around in the 1960s and ’70s? After some digging online, I found that cinders in many places lasted for decades after steam, and in the coal fields, it’s tough to tell cinders from spilled coal anyway, so an added incentive for cinders, at least on sidings and secondary tracks. For the main tracks, photos show the Southern’s ballast in this area was a medium gray. I toyed around with trying to find some actual rock to use as ballast, but in the end I decided on good old Woodland Scenics products made from crushed walnut shells because I can find it readily, it doesn’t cost an arm and leg to ship, and it’s pretty easy to work with. I used fine cinders and medium sized gray ballast in the big shaker containers for this project, and I was able to do the entire lower deck (12′ x 16′) with just under two shakers of each color (4 shakers total).

Second, I did a bunch of research on how to apply ballast, and I am so glad I did! In the end, I went mostly with the method Cody Grivno of Model Railroader lays out in the article here. The only other materials I needed were white glue (I bought a gallon), isopropyl alcohol (I used about XX oz), and dish soap. For tools, I used a spoon, a large flat brush, a white glue dispenser (like the ones kids use in school), two small jars with eyedroppers, a work glove, and my fingers. In the glue bottle, I mixed up some “just a bit wet glue” which is about 2 parts white glue, 1 part water, and a drop or two of dish soap–when you squirt it out, it should dissipate from its bead but not run. In one of the jars with an eyedropper, I made a mix of “very wet glue” of about 1 part glue, 6 parts water, and a drop or two of dish soap–it should look about the consistency of milk and absorb into the wet ballast (I’ll explain that in a minute) after a few seconds. You’ll need a LOT of the very wet glue, so you can either make a big batch or mix it on-demand when you run out (what I did… it was a lot of trips). The remaining jar and eyedropper are for the isopropyl alcohol.

Ballasting Step 1
Step 1. Lay down a pile of ballast in the gauge between the rails
Ballasting Step 2
Step 2. use a finger to spread the ballast between the ties, moving excess to the next section

I worked on the track in about 2 foot sections, usually one track at a time. If you’re doing two ballast colors, determine which ballast should be “lower” and work on that one first–for me, the cinders were replaced by ballast rock, so where they overlap, I did the cinders first. With about half-a-spoonful of ballast, I first apply it to the “gauge” (inside the rails) of the track. It takes a few tries to get a feel for how thick to lay it, but it becomes routine pretty quick. You want just enough that when you spread it the ballast fills the space in between the ties and rails with little on top of the ties and nothing on the rails. I found my finger to be an effective spreading tool, and I just rub it back and forth down the tracks, rubbing any excess ballast to open areas. Cody glues his ballast at this point, but I found it easier to lay the edge ballast first. I applied ballast to the edges by first running a bead of glue from the bottle down the side of the subroadbed and on top of the scenery–this helps the “slope” to hold better. Next I used the spoon to apply ballast inward toward the rail from about the edge of the ties until I couldn’t see the edge of the subroadbed any more. I used my finger again, first to poke the ballast under the rail a bit, then to wipe off the tops of the tie edges, and then to pat down the sloped edges until they looked smooth. I used a brush to clear off any unwanted ballast to outside the range of the glue (I vacuum it up later) and to remove any stubborn ballast from areas my finger couldn’t get to.

Ballast Step 3
Step 3. Add ballast to the edges of the track, use a finger to work it into the ties, then use a finger to clean it off the ties and shape the slope

Once I’m happy with the ballast shape, I glue it down. The critical part of this process is to USE THE ALCOHOL AS A WETTING AGENT FIRST! If you just add the glue, the ballast will float (and float away) which makes a frustrating mess. You can avoid this by first saturating the ballast with an eyedropper of isopropyl alcohol–just drop until everything looks wet. I follow the alcohol wetting with the very wet glue, making sure I apply drops to every section of ballast until things were saturated and it took a couple seconds for the glue to soak in. If you drop a big glob of white glue that somehow didn’t get diluted, no worries–just dilute it with some alcohol, and it will likely settle in just fine. I wet and glued each section by starting with the gauge between the rails, then moving to the edges. I found for the edges it’s better to start the alcohol low and work up to keep things in place, and its better to start the glue high and let it work down.

Ballast Step 4
Step 4. Using a dropper, soak the ballast with isopropyl alcohol
Ballast Step 5
Step 5. Saturate the wet areas with wet glue

Turnouts require a bit more care, and I probably didn’t take all the care I should have… it worked out ok, but I spent a couple hours massaging my turnouts to get them working smoothly again. I spread the ballast a little less thickly between the ties to make sure the points wouldn’t catch, and I took care to avoid putting ballast in the area of the throw. No matter how careful I was, there was always some piece determined to get stuck in the throw, so I used the brush (and the occasional X-Acto blade) to fish out any offenders. I used the very wet glue sparingly in these areas, but there was still some glue that stuck to the top of the ties causing the points to stick a bit. I believe Cody’s method is to drop the glue in first, then add the ballast under the points, and I think I’ll try this next time.

Ballast Step 6
Step 6. Clean off any excess ballast–I use a work glove for this
Ballast Step 7
Step 7. Clean any remaining ballast from the web of the rail–I use a combination of a matchstick and fingernails

After letting the glue dry overnight, I clean up any excess ballast. First, I use a work glove and rub it over the top of the ties and edges to knock off any obtrusive pieces. Next, I clean out the area in the web (sides) of the rail using a matchstick rubbed back-and-forth followed by a fingernail. I used a flathead screwdriver to clean out flangeways if necessary. I cleaned up any excess with a vacuum. You’ll inevitably find spots you missed with the glue, but it’s easy to just add more ballast, drop some alcohol, then drop some glue to repair.

Ballast is scenery, so I also wanted it to tell a story. Because track repairs would have been made with gravel instead of cinders in my era, I picked a few spots along the cinder-ballasted yard tracks to fill with gravel (in this case, Woodland Scenics fine gray ballast) to simulate a replaced tie. I like the look! I also picked a few spots in prominent areas to lay some cinders on the scenery to go underneath the ballast rocks to show that some tracks were once cinders but had now been ballasted with rock. I also laid a thin layer of cinders in areas where I know tracks used to be, even though I don’t model them in my era. Finally, I added extra cinders to areas under tipple chutes and where locomotives sit to represent spilled coal and grime. I’m pretty happy with how these “extras” turned out, but they won’t fully tell the story until more scenery is complete.

Simulated Track Repairs
The St Charles yard where the main is clearly visible. The gray areas on top of cinders represent tie repairs after the age of cinders

Ok, the ballasting was the last step before adding the upper deck, but you’ve heard that before… We shall see.

Finished Ballast at Mayflower
Here’s the finished ballast at the Mayflower tipple–the road is made from fine ballast as well

 

 

 

Lower Level Scenery Base Complete

Layout view 1 - Oct 2023
Here’s what the layout looks like from the door as of October 2023–this is from eye-level, so you can see where the upper deck will sit

Just a quick progress update. This week I passed a major milestone by completing the scenery base on the lower level to the “dirt base” level. This is the minimum I wanted to complete before moving to the upper level, so now nothing stands in the way. I’m debating doing a little track ballasting and a couple more mock-up tipples, but it’s exciting to finally be at a point where I can start putting in upper-level benchwork! I found a pic from three years ago to show the progress over time. I’m sure not moving fast, but there’s definitely been a lot of progress!

Layout view 3 - Oct 2023
Looking back toward the door and the Mayflower Tipple. If you follow the tracks back from Mayflower on the right, you’ll pop out at the far end of the aisle on the left

 

Layout view 2 - Oct 2023
Looking along the St Charles yard with the wye ahead on the left–compare the progress in Oct 2023 to a similar shot from Oct 2020

 

Finished Lower Level Benchwork
Similar view as above from three years prior in Oct 2020