Monthly Archives: December 2021

2021 Year-End Review and 2022 Goals

Lower Level Wiring Bus
The layout as of January 2021

Sometimes progress on a layout is painfully slow, especially for those in a stage of life with kids at home and full-time work. Time working on the layout comes in fits and starts as it takes a back seat (as it should) to other more important priorities. It can be discouraging to look at the accomplishments of a single evening or even a week and say “wow, I only laid three feet of new rail…” or “wow, all I accomplished was new Kadee couplers and cut bars on two hoppers…” I’m certainly not breaking any new philosophical ground here, but to really see progress, it’s important to look further back and see how far we’ve come.

First L&N CV Local
First multi-train operating session in December 2021

While 2021 will be etched in my brain as “Year of the COVID – Part 2,” it will also go down as a significant year in the life of the St Charles Branch with many important milestones. When the year started, the layout was essentially a staging level, a helix, and a lot of benchwork for the main level–not a single rail had been laid on what will eventually become the part of the layout with scenery. By the end of the year, I had the first real operating session with multiple trains and all the paperwork. Here are some specific milestones:

  • All the rails on the lower level complete (not an insignificant milestone for 100% hand-laid track)
  • First “scenic” elements on layout (Bailey’s Trace bridges for St Charles wye)
  • Several locomotives completed (F3A, GP7, GP35, GP38AC)
  • Several unique hoppers completed (CofGa short-taper offset, INT “hand-me-down”, SOU 100T “articulated” hopper)
  • First mine run (Drew and Dan Bourque – Mayflower tipple)
  • First multi-train operating session (Patrick Tillery and Dan Bourque)

Like reflection on progress, goals for the future are also important. While the layout will always take a back seat to other priorities, here are the things I hope to accomplish in 2022:

  • Complete main helix between lower and upper level
  • Complete and paint lower-level backdrops
  • Finish benchwork for upper level
  • Build basic terrain for lower level
  • Lay track for at least one tipple on upper level
  • Have at least 3 more operating sessions to include first train to upper level

We’ll see at the end of 2022 how I did at meeting these goals. Even if I don’t complete them all, it’ll still be fun–Happy New Year!!!

First Multi-Train Operating Session

First L&N CV Local
Patrick Tillery stops at the St Charles depot while running the first-ever L&N CV Local

I’d like to thank Patrick Tillery for informing we he was coming over Monday night to check out progress on the layout which became the catalyst for the first multi-train operating session on the St Charles Branch! Despite some major obstacles such as having to reach under or across the layout to throw switches and a couple turnouts and cars that were acting up under their first real use, we managed to run 3 trains: the St Charles Local, the St Charles Switcher, and the L&N’s CV Local. These are the three primary trains on the layout during “busy times” across all eras of the layout–the timing of the trains may vary, but each serves the same basic function.

The St Charles Local is a scheduled train that runs between Appalachia/Andover, VA and St Charles. In leaner times, it serves as the mine run for the St Charles area branches. In heavier times, it serves to shuttle empty hoppers to the small “yard” at St Charles and pick up loads retrieved by the St Charles-based mine run. This is the “big train” on the layout and the only train to ever be assigned more than two locomotives.

The St Charles Switcher, known in some eras at the Black Mountain Local, is the mine run based out of St Charles that serves the area loaders. It picks up empties dropped off by the St Charles Local and plies the numerous branches and tipples dropping off empties and picking up loads. This train is the star of operations on the layout and the only train that will normally have a crew of two (conductor and engineer).

First LN CV Local at Mayflower
L&N CV Local runs around its empties at Mayflower with Patrick at the controls–the C420 is still in TC colors

The L&N Cumberland Valley (CV) Local is the only other scheduled train on the layout. This train works the old L&N mainline between Corbin, KY and Appalachia, VA including the modest coal loadings of the Middlesboro, KY area mines and the St Charles Branch. The L&N has trackage rights over the portion of the St Charles Branch from L&N Junction (Pocket), VA to the ends of the branches beyond St Charles which it reached via a short L&N branch between Pocket, VA and the L&N’s CV mainline at Pennington, VA. Despite several loaders in this area, the prototype CV Local never seemed to need more than a single locomotive, an RS3 or a C420, to handle the handful of hopper loads bound for the L&N.

Last night’s operating session took about 2 real hours. Patrick took the first train, the L&N CV Local, up to Mayflower to swap out 4 empties for 5 loads. Leading the train was Alco C420 400 still in Tennessee Central colors (it’s bound for the paint shop soon, but the L&N used ex-TC C420s on this line because they were the lightest on the railroad). The CV Local had to first stop at the depot track on St Charles wye to pick up an extra set of orders from the Southern dispatcher. This job took about 40 minutes from start to finish. After the L&N CV Local cleared St Charles, the St Charles Switcher with me as engineer showed up with 18 cars – 16 empties, a covered hopper of fertilizer for Mayflower, and a boxcar for the team track at St Charles. It took about 20 minutes to assemble the loads from the previous day and replace them with the fresh cars in the tiny 3-track yard. A derailment kept the L&N CV Local waiting for a few minutes until the superior train on the timetable was finally able to depart for Appalachia.

With the home rails now to itself, the St Charles Switcher left the house track next to the depot to serve four tipples with Patrick as engineer and me as conductor. We worked the two local tipples first, JAD Turner and Cavalier, before swapping out the boxcar for a now empty flat on the team track. With the locals taken care of, we swapped roles and picked up the remaining empties an the load of fertilizer and headed up the branch to Mayflower. At Mayflower, it took two sets of run-around moves to place the empties above the tipple and swap out covered hoppers on the tail track. One more run-around set us up to work the stub track at Baker before assembling all the loads and departing town. A little blocking back at St Charles yard rounded out the job which took nearly an hour.

All told, we got 2 hours of operations out of just 1/2 the layout–not bad! Despite working out a few kinks in the rolling stock and trackwork, the overall track arrangements worked well for the jobs–they required enough moves to keep operators thinking and having to make smart moves without being frustrating for lack of sufficient track. I underestimated how handy it is to have a wye for turning trains working the yard instead of having to run around the length of the train. It was also the first major use of paperwork on the layout, something I’ll describe in more detail in a future article.

I’m so glad Patrick was up to playing guinea pig for the first session, and I’ve now got a new punch list of stuff I need to fix before attempting this again. All part of the learning process!

Major Milestone – Lower Level Track Complete

L&N taking a test spin
L&N RS3 100 takes a trip around the wye at St Charles
St Charles yard tracks complete
Completed St Charles yard tracks

Hit a major milestone yesterday: the lower level tracks are complete! I completed the first scene, the end of the line at the Mayflower tipple, several months ago, and the last few months I’ve been working on the long scene at St Charles. St Charles – the branch’s namesake – was home to a wye, a depot, a couple small tipples, and a three-track “yard.” St Charles was also home to a mine run when the tipples were busy, so this is the central scene on the layout. All told, the St Charles scene is about 26 linear feet long and required 14 hand-laid switches (about 1/2 of them curved) and a couple of bridges.

Electrically, I made the entire Mayflower branch an auto-reversing zone for the wye. Can I just say the On-Guard AR solid-state DCC auto-reversers are awesome? The switching of polarity on the wye is absolutely seamless and unnoticeable–I highly recommend them! I also isolated a single rail of both the “house track” and “engine track” in the middle of the wye and will place a switch on the fascia. This will allow me to turn the power off to the two tracks that would hold idling power in case any sound locomotives get annoying. Next step is fascia and switch controls.