New Branch Up-and-Running

Kemmergem Tipple Mock-Up
Newly completed Kemmerer Gem No.2 tipple mock-up on the Gin Creek Branch

I’ve been working feverishly on the Gin Creek Branch which served the distinctive two-track loader at Kemmergem, VA. This branch occupies about 1/3 of my upper deck and is the first piece of the upper deck to be operational. I went out of my way to make the trackwork look like a well-used and minimally maintained branch with some crooked ties and rail. This branch is also laid out on an S-curve where you can look all the way down the straight portion where the loader will lie between the curves, and because of this curve, I think this might become the “signature scene” for the layout.

First Train on Upper Deck
Here’s the first train on the upper deck rolling through the junction onto the Gin Creek Branch at Turners Siding

 

First Train on Upper Deck
The tail track just barely holds two GP38s and two triple hoppers

To get things operational, I had to run the DCC bus wires and install manual switch mechanisms. At this point, I was able to run the first train to the upper deck and make sure everything worked. It’s a cool arrangement with double-ended loader tracks but a short tail track that barely holds two GP38s and two triple hoppers. I’ve also installed a stub track alongside the tail track for the Ralph Baker coal company that built a truck dump here in the late ’70s / early ’80s. Since I’m currently running the ’60s, I decided to use the track to house a small ramp-style loader (which will be replaced by Ralph Baker in late ’70s ops sessions). Switching the track arrangement is a lot of fun and requires some extra thinking since the spur to Ralph Baker is a facing-point stub track, and the only run-around is under the Kemmerer Gem No.2 tipple. You’ve got to place the cars for Ralph Baker and the cab behind the empties for the big tipple and then push them into the right tracks using the loads and empties under the big tipple.

Kemmergem Tipple Mock-Up
View of the south end of the loader at Kemmergem

While it was “operational,” there was still no tipple, and the switches had to be thrown by reaching far under the layout. With an upcoming ops session, I was motivated to give it a bit more finish, so I cut and painted the fascia and put in the switch controls. I also took the opportunity to install my fast-clock controls in their permanent place, a little cut-out in the fascia. What’s a mine run without a loader, so I created another temporary “paper doll” mock-up from cardstock prints and foamcore for the Kemmerer Gem No.2 tipple. This is a really cool looking loader that has two loading points with a long covered conveyor between them making the thing look a bit like a corrugated diplodocus dinosaur. I created some drawings of a slightly compressed version based on a series of photos from the ’50s-’90s (it didn’t change too much) including some great detail shots by Robby Vaughn. While I was at it, I created a little temporary dock for the Ralph Baker spur (which I’m calling “Darbyville Dock” for the ’60s sessions). A couple of paint brush handbrakes on the steeper spotting locations, and the branch was ready for an ops session!

Kemmerer Gem 2 1998
The prototype Kemmergem tipple shot by Robby Vaughn in the late ’90s

 

Kemmergem Tipple Mock-Up
Gluing the prints onto foamcore for the tipple

 

Kemmergem Tipple Mock-Up
Mock-up for one of the two loading points waiting for a paper roof

 

Darbyville Dock
Mock-up of “Darbyville Dock” at the end of the Gin Creek Branch–note the gnarly trackwork on the tail track to the right

 

Fast Clock Controls
Here’s the finished fast-clock control panel recessed into the upper deck fascia.

Leave a Reply

Your email address will not be published. Required fields are marked *