K&T Diesel Era track plan N
- Size: 10′ x 10′
- Scale: N
- Minimum Mainline Radius: 13.5″ (18″ for Southern)
- Minimum Aisle Width: N/A
- Designed by Dan Bourque
The Kentucky & Tennessee in the diesel era was a simple operation. A handful of used Alco S2 switchers moved coal hoppers between the connection with the Southern at Stearns, KY to the lone tipple at Justus, about 3 miles from Stearns. Justus loaded about 30 Southern 100T hoppers per day via a small flood loader directly over the main. The hoppers were picked up and dropped off in the ample interchange yard in Stearns where the K&T interchanged with the Southern’s busy CNO&TP mainline. Despite the … Read more