Big Eagle RR’s SW1500 awaits its next assignment. The small yard is the load yard for the rail-to-barge transloader at Winifrede Jct, WV in Oct 2014. -Stuart Thayer
Big Eagle RR’s SW1500 awaits its next assignment. The small yard is the load yard for the rail-to-barge transloader at Winifrede Jct, WV in Oct 2014. -Stuart Thayer